Renewal of the Mill Race: eco-corridor and promenade for pedestrians and cyclists
Bringing water back to the historic city centre. Connecting recreational areas, revitalising the watercourse, benches and smart energy-saving lighting.
- Budget
- 5.3 mil. €
- Works start
- Summer 2026